• IWantToFuckSpez@kbin.social
    link
    fedilink
    arrow-up
    26
    ·
    edit-2
    10 months ago

    The Romans had a 10 month calendar that started with March. Then later they added January and February to better match the lunar cycles in a year. Hence the mismatch of the numbered months.

    • Alto@kbin.social
      link
      fedilink
      arrow-up
      16
      ·
      10 months ago

      I was under the impression that July (Julious) and August (Augustus) were the two shoehored in

    • dentoid@sopuli.xyz
      link
      fedilink
      English
      arrow-up
      9
      ·
      10 months ago

      I always assumed this is why the leap day is in february, since it would coincide with the end of the roman calendar

      • Rinox@feddit.it
        link
        fedilink
        English
        arrow-up
        5
        ·
        10 months ago

        I think it’s in February because it’s the shortest month, and it’s the shortest month because it was the last one, with all the remaining days.

        The thing I’m not sure about is why some months have 30 days, some 31 ¯\_(ツ)_/¯

      • uniqueid198x@lemmy.dbzer0.com
        link
        fedilink
        English
        arrow-up
        4
        ·
        10 months ago

        They had something like ten non-month holy days that the consoles were responsible for sticking in the calendar. This traditionally corrected for the drift. In the political turmoil leading up to to ceasar, this didn’t get done. When ceasar imposed the new calendar, he had to insert like 40 extra days to the first year in orderto correct this.