So, previously, I setup these 2 of the 4 Normal Coal nodes down by Coal Lake, for running the Coal Power Plant. Now, I realize I need 2 more Coal nodes, for a Steel factory, and… I actually want the 2 nodes that I used for the Power Plant. Because what I’m going to DO with those two nodes is run them up the cliff, to where there’s a ton of Iron nodes.

So, today’s effort is to extend the little platform here across to the other 2 Coal nodes, wire them all up, and then swap the Power Plant over to those.

Nothing too crazy, just more of what I already did for the first 2.

And with the Power Plant now running on the 2 new nodes, I’m free to tear the first 2 down, in preparation for re-running them up the cliff.