• HobbitFoot @thelemmy.club
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    1
    ·
    11 months ago

    It is becoming a lot more complicated than that.

    A lot of newer contracts are design-build, where the Contractor is given a design that is conceptual and the Contractor has to finish the design and build it. Because the design is partially done by the Contractor, the contract is usually won by a combination of price and rating based on technical merit.